Stage №2. Directly paving
If the soil on the site is dense, then the tiles can be laid on a dry cement-sand mixture, and if it is loose, then it is better to give preference to a solution. In our example, the first option is considered.
Step 1. A mixture of cement (four-hundredth or five-hundredth) and a little damp sand in a ratio of 1:4 is laid on the prepared base. Be sure to take into account that after laying, the tiles will sink approximately 0.5-0.7 cm.
Cement-sand layer
Step 2. Next, the paving stones are laid in accordance with bosnia and herzegovina mobile database sketch. The height of the paving is fixed using a stretched cord. It is recommended to stretch the latter between two bricks located on both sides of the future path, so that it can be moved later as needed. The position of individual elements is adjusted with a mallet. The paving stones should be laid away from you, cutting the elements with a grinder with a diamond disc if necessary.
It is advisable to pour the mixture in such portions that the tiles will be laid by the end of the day.
Step 3. To improve the quality of the paving, after paving the paving stones, it is advisable to go over them with a vibrating plate - this way the elements will be more firmly compacted into the base.
The paving stones are compacted with a vibrating plate
Step 4. After removing the construction waste, the seams between the elements are filled with a mixture of sand and cement (sometimes just wet sand is used) using a brush. The excess mixture is removed. That's it, the path is ready and you can easily drive up to a private house!
The process of laying paving stones
-