The pipeline is connected to the sewer manhole using the cutting method with joint sealing.
The pipeline is connected to the bathhouse itself through the strip foundation by installing the pipe in the technological holes and sealing the connection point with cement mortar. The video shows the process of laying sewer pipes.
Installation of internal sewer outlets
The laying of pipes for equipping the sewerage system of internal premises depends on the planned method of flooring, the functional purpose of the premises and the number of drain points.
In small baths, water drainage is assumed directly from malta mobile database washing room. Other options assume drainage from several points, including the toilet and additional water supply points, such as a shower or washbasin.
All this must be taken into account when planning a bathhouse, to ensure the necessary technological conclusions when pouring the foundation.
The material for covering the floor is also of great importance for how the drain in the bathhouse will be organized.
Organization of sewerage with wooden floor.
In this case, the calculation and laying of the floor covering is carried out in the traditional way, that is, logs are laid on the support pillars, to which the floorboards are fixed. The process of laying floors in a bathhouse
When fixing the boards in the washing room, a technological gap of 50 mm is made between them for draining water. Continuous laying of boards is also allowed, in this case it is necessary to provide a floor slope to one side for drainage.
However, it should be noted that with a sparse method of laying the floor, the boards will be better ventilated and dry, which will ensure a longer service life.
Directly under the floor, a concrete base is arranged, into which a sewer drain is mounted. To ensure floor ventilation, the distance from the concrete to the boards should be at least 15 cm.
Example of a sewer outlet device in a bathhouse
-